As you can see from the blog prior to this one, the construction has been flying through the winter break. I've also decided to change up the layout a bit and recolor the site. Some noticeable improvements are a new chronological directory of posts on the upper right hand corner (the blog is getting long) and I put up some links to the Mainpage and Wiki.
Returning back to business, according to Ray Pruitt, site supervisor for Bovis Lend Lease, we are right on schedule. The recent changes have been flooring and walls put up for the 1st floor. Ray took Jordan and me around the first floor and into the basement. There are plenty of cool pictures below from the trip (remember to click to enlarge the photos), but for some reason, the camera refused to take shots in the basement. From my point of view, it was cool and damp while the rooms are quite large (bigger than I had imagined).
Classes begin tomorrow so I want to wish everyone a great spring semester and be sure to check out the blog for future entries keeping you posted on the construction of our future home!
Take care,
-Scott
No comments:
Post a Comment